Ground Improvement & Services
If the soil can't carry the load, we change it.

Or we reinforce it, or carry the load deeper to firm strata.
When the ground cannot carry the load, there are three ways to go. Change the soil so that it can, reinforce it, or carry the load past it to stronger strata.
This family includes our design, supervision and turnkey services, so that one team can take a site from investigation to handover.
Soil Nailing
Grouted bars and face mesh holding cut slopes.
Steel bars are drilled and grouted into the slope on a grid, and a facing of mesh and shotcrete spreads the load at the surface. The nailed soil mass then acts as a gravity retaining structure. Nailing is built from the top down as the excavation proceeds, which makes it a good match for cut slopes and basements.

Shotcrete
Sprayed concrete facing and concrete repair.
Concrete is sprayed onto a prepared face over mesh. It is used as the facing for nailed slopes, as a skin to stop weathering of a cut, and to repair deteriorated concrete. Mix, thickness, mesh cover and curing are specified, and test panels confirm the quality.
Stone Columns
Densify and drain soft soils, cut settlement.
Columns of compacted stone are built through soft soil. They stiffen the ground, carry load, speed up drainage and reduce settlement. They suit soft soils beneath footings and rafts and embankments over weak ground. A trial area confirms the column diameter and the improvement achieved.
Soil Stabilisation
For pavements and foundations on weak ground.
Weak soil is treated in place or in a pugmill with lime, cement or other binders. Strength and stiffness rise, and swelling falls. It is applied beneath pavements and slabs on weak ground. The binder and dose are set by laboratory trials on the actual soil.
Erosion Control
Coir, geomats and vegetated systems for exposed slopes.
Exposed slopes are protected with coir, geomats and vegetated systems until the plants take over. The surface layer is chosen for slope angle, rainfall and soil. Drainage at the crest and toe is part of the design, since concentrated flow defeats most surface systems.

Paving & Surfaces
Paving fabrics, interlocking pavers and turf blocks.
Paving fabrics slow reflective cracking under asphalt overlays. Interlocking pavers and turf blocks give permeable, load-bearing surfaces for car parks, yards and access roads. The base layer and edge restraint govern performance as much as the surface unit.
Design Support
Calculations, drawings and specifications, verified by qualified engineers.
Calculations, drawings and specifications for the systems we supply and build, prepared in house and checked by qualified engineers. We can also support a client’s own consultant with design information, options and cost comparisons.
Turnkey Installation
Design, supply and build under one team.
Design, supply and installation under one team and one programme, from site data to handover. Responsibility sits in one place, so that interfaces between designer, supplier and installer do not become gaps.
Site Supervision
Supervision and stage-wise QA records for contractor-built works.
For works that the client’s contractor builds, our engineers supervise installation and keep stage-wise quality records. That includes checking material against the specification, inspecting each stage and recording tests.
Bored Cast-in-Situ Piling
When the load has to reach firm strata, we take it there. Piles are bored, reinforced and concreted in place, sized to the structure and the ground.
Our rigs bore piles of up to 1200 mm diameter to depths of 32 m, through fills, soft clays and weathered rock, with stage-wise records kept from boring to concreting. Piles carry the load of bridges, flyovers, heavy plant and buildings on weak or variable ground down to firm strata.

Where each method suits
A first guide.
Method and design follow the site investigation.
Soil nailing and shotcrete suit
- Cut slopes and excavations needing support
- Natural slopes with shallow instability
- Facing deteriorated concrete
Stone columns suit
- Soft soils beneath footings and rafts
- Embankments over weak ground
- Sites needing faster consolidation
F10, Deep foundations
Bored cast-in-situ piling.
When the load has to reach firm strata, we take it there. Piles are bored, reinforced and concreted in place, sized to the structure and the ground.
Our rigs bore piles of up to 1200 mm diameter to depths of 32 m, through fills, soft clays and weathered rock, with stage-wise records kept from boring to concreting.
- Bridges, flyovers and ROBs
- Heavy industrial and plant foundations
- Retaining structures and marine works
- Buildings on weak or variable ground
Where this family works

Roads, Highways & Rail
RS walls and embankments, weak-subgrade stabilisation and cut-slope protection.

Hill Slopes & Mining
Drapery, rope nets, barriers and anchoring for rock and soil slopes.

Industrial & Urban
Retaining structures, ground improvement, ponds and pipeline protection.
Planning ground improvement works?
Send the plan or section, the soil or rock report and the design loads. We typically respond within one working day.